How many cubic yards of material will be required to fill the trench, after accounting for the removal of material?

Study for the Texas Wastewater Class A Exam. Enjoy flashcards and multiple choice questions, each with hints and explanations. Prepare effectively for your exam!

To determine the amount of material needed to fill a trench after accounting for the removal of material, it is essential to consider the dimensions of the trench as well as the volume of material that has been excavated. In this scenario, the answer of 3,525 cubic yards implies that this is the total volume calculated based on the trench dimensions and the volume of materials removed.

When filling a trench, the calculation typically involves measuring the length, width, and depth of the trench to find the total volume. Any material that has been removed from the trench will need to be replaced or compensated for by adding new material to achieve the desired fill level.

The specific outcome of 3,525 cubic yards indicates that proper volumetric calculations have been conducted, which may involve adjustments for any settling or compacting of the material once it is placed in the trench. Having an accurate understanding of these calculations ensures that the trench will be adequately filled and is important for maintaining structural integrity and proper drainage in wastewater applications.

Other options may not reflect the accurate volume needed due to potential miscalculations or misinterpretations of trench dimensions or excavation amounts, leading to either underfilling or excessive material usage. Thus, 3,525 cubic yards stands as the proper quantity